BUILDING THE WALL

HOW IT IS MADE AND HOW IT IS DELIVERD
 
      
             
THE MOVING WALL FRONT VIEW WITH FLAG
Surveying for the foundation and platform for the wall panels has begun.

Building the foundation and platform to support The Moving Wall panels began with a Site Survey on Monday, June 15, 2026, and the establishment of a Control Point ("CP") marked on the pavement. Precast Concrete Post Bases/Foundations, along with additional building materials, will be delivered to the site early Wednesday morning, June 24, 2026. Sixty-four (64) precast concrete bases/fdns and posts will be placed to support the top board. The next step will be to level the platform and prepare it for the delivery of the actual wall panels to the site early Thursday morning, June 25, 2026.

For a video about "How The Moving Wall Is Made,” just scroll down.  
 
PLATFORM MATERIALS ARE SUPPLIED THROUGH A GRANT FROM
HOME DEPOT FOUNDATION
Volunteers are needed to help build the platform and install the panels. Additionally, power tools, INCLUDING A TABLE SAW and a generator, will be required. Volunteers and donations are welcome.
 
HOME DEPOT FOUNDATION
  
"FEATURED SPONSOR" (Platform Building Materials)
Providing platform-building materials for
"THE MOVING WALL"
THE MOVING WALL UPDATE
  
Here's a link to a previous display of THE MOVING WALL
The Moving Wall | Tri-state News | telegraphherald.com
 

FEATURED SPONSORS ADDITIONAL BENEFITS INCLUDE 
The sponsor's trademark and/or logo, approved and provided by the sponsor, will be displayed on the VFW Post 6418 On-Site Program and Banner. Featured sponsors will also be recognized during the opening and closing ceremonies. 
Includes the Sponsor being displayed (substantially) on the
St. Albans VFW Post 6418 website and Banner
 
 VIDEO
HOW THE MOVING WALL IS MADE
 
Site plan for the platform layout.  Click on the "Layout" image below for a link to an Aerial View of
The Vietnam Veterans Memorial
SITE PLAN LAYOUT